Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Use this report to identify over an extended time period the true loading in BHCC which can be used as an indicator for server hardware upgrade. In the example below, maximum BHCC can be calculated by multiplying peak Interval Call Completions by 373 x 100 - = 37,300 BHCC.

Replaces Call Rate Report